perm filename DDN39.TXT[RFC,NET] blob sn#791668 filedate 1985-04-25 generic text, type C, neo UTF8
COMMENT āŠ—   VALID 00014 PAGES
C REC  PAGE   DESCRIPTION
C00001 00001
C00003 00002
C00007 00003	       25 Apr 1985                       DDN Newsletter Special Issue 39
C00011 00004	       DDN Newsletter Special Issue 39                       25 Apr 1985
C00013 00005	       25 Apr 1985                       DDN Newsletter Special Issue 39
C00017 00006	       DDN Newsletter Special Issue 39                       25 Apr 1985
C00021 00007	       25 Apr 1985                       DDN Newsletter Special Issue 39
C00026 00008	       DDN Newsletter Special Issue 39                       25 Apr 1985
C00030 00009	       25 Apr 1985                       DDN Newsletter Special Issue 39
C00034 00010	       DDN Newsletter Special Issue 39                       25 Apr 1985
C00038 00011	       25 Apr 1985                       DDN Newsletter Special Issue 39
C00041 00012	       DDN Newsletter Special Issue 39                       25 Apr 1985
C00044 00013	       25 Apr 1985                       DDN Newsletter Special Issue 39
C00048 00014	       DDN Newsletter Special Issue 39                       25 Apr 1985
C00050 ENDMK
CāŠ—;






       =================================================================
       DDN NEWS 39, SPECIAL ISSUE             DCA DDN Program Mgt Office
       25 Apr 1985                     Published by: Network Info Center
                                      (NIC@SRI-NIC.ARPA)  1-800-235-3155

                             DEFENSE DATA NETWORK
                                  NEWSLETTER

       Maximum   Distribution   Requested.      The  DDN  NEWSLETTER  is
       distributed by the Network Information Center under DCA contract.
       For  addition  to  the  online  mailing  list,  contact  NIC@SRI-
       NIC.ARPA.  Back issues may be obtained by FTP from the  directory
       DDN-NEWS: at SRI-NIC [26.0.0.73 and 10.0.0.51] using the filename
       format  DDN-NEWS:DDN-NEWS-xx.TXT  (where"xx"  is  the  newsletter
       number).  

       =================================================================

       Section I. OFFICIAL

                                    TOPICS

                1.  MILNET/MINET INTEGRATION
                2.  DDN NODE INSTALLATION SCHEDULE
                3.  DODIIS NETWORK
                4.  HOST INTERFACE QUALIFICATION ACTIVITY
                5.  DRAFT DCA CIRCULAR FOR X.25/1822 HDH
                    QUALIFICATION TESTING
                6.  DDN HOST INTERFACE ACQUISITION
                7.  PERSONAL COMPUTER (PC) SUPPORT
                8.  MILNET TAC ACCESS CONTROL
                9.  DEADBOLT--AN ENCRYPTION/AUTHENTICATION DEVICE
               10.  USER REQUIREMENTS DATABASE (URDB) STATUS
               11.  TELECOMMUNICATIONS SERVICE REQUESTS (TSRs)
               12.  DDN COST ALLOCATION MODEL
               13.  DDN LOGISTIC SUPPORT
               14.  NETWORK ACCESS COMPONENT (NAC) UNITS FOR THE
                    DEFENSE DATA NETWORK
               15.  REQUEST FOR DOCUMENTS
               16.  DDN MANAGEMENT BULLETINS AND NEWSLETTERS
       25 Apr 1985                       DDN Newsletter Special Issue 39







                           MILNET/MINET INTEGRATION

       Integration   of   the   USEUCOM  MINET  communication  subsystem
       (including  all  backbone  and  access  lines)   into   the   DDN
       unclassified  segment (MILNET) was completed on 18 December 1984.
       The ongoing MINET stage II (western Med.)  installation  will  be
       completed under current contract arrangements.  Further expansion
       of communications support to the MINET user community,  including
       engineering  and  installation  of stage III (eastern Med.), will
       evolve through follow-on expansion of the MILNET.  This expansion
       will  include  increased inter- and intra-theater connectivity as
       part of the DDN program.  (James Powell, B613, 703-285-5101,  (V)
       356-5101.)



                        DDN NODE INSTALLATION SCHEDULE

       The  DDN  PMO  has  completed  an initial draft Node Installation
       Schedule which encompasses 120 new DDN MILNET, DISNET, and DODIIS
       installations  between  February 1985 and April 1986.  A majority
       of sites  have  completed  their  nomination/presurvey  and  site
       survey   processes,   and  many  are  ready  to  begin  equipment
       installation.   Detailed  schedules  which  were  coordinated  in
       February  with  Service  representatives  and  the  DDN principal
       contractor, BBNCC, have  been  published  and  forwarded  to  the
       Services and DCA Action Offices for implementation.

       Two major changes to installation approach have been directed:

          1. Node  equipment  (i.e.,  processor,  modem  and crypto
             cabinets) will be installed and integrated  into  site
             facilities    in    accordance    with   site   survey
             documentation  independent  of  the  availability   of
             interswitch  trunk  (IST) lines.  In those cases where
             IST availability does not support  activation  at  the
             time  installation  is  complete,  DCA  will  have the
             contractor revisit the site when the ISTs  are  turned
             on  for  use  not  only to complete integration of the
             node  into  the  network,  but  to  execute  line  and







                                       2
       DDN Newsletter Special Issue 39                       25 Apr 1985





             equipment performance testing and acceptance.

          2. DCA  will  fund  and/or  perform  site engineering and
             installation tasks in support of the installation plan
             and  schedule  when  the  Service  E&I  agency  cannot
             support the required schedule.  This approach is taken
             temporarily  to  expedite  completion  of  the crucial
             expansion effort through April 1986 and to permit  the
             services  to successfully complete programming actions
             to support site E&I work beginning April 1986.

       (Ltc Bruce Sweeney, B647, 703-285-5007, (V) 356-5007.)





































                                       3
       25 Apr 1985                       DDN Newsletter Special Issue 39





                                DODIIS NETWORK

       The Department of Defense Intelligence Agency Information  System
       (DIA/DODIIS) community will have a secure data network consisting
       of C/30 IMPs and a C/70 Monitoring  Center  at  approximately  40
       sites  around  the  world  within  the  next  four  years.    The
       subnetwork, provided by the DDN PMO, will be integrated into  the
       DDN  Integrated  Secure  Network  (DISNET)  when  blacker devices
       become available.  Service O&M commands have  been  requested  to
       confirm  site  selection/nominations  made  by  DIA  for the 1985
       DODIIS expansion.  DODIIS also has a test facility consisting  of
       2 C/30s, a C/70 MC, and supporting TEMPEST terminals and printers
       located in the DIAC  at  Bolling  AFB.    The  initial  phase  of
       installation,  including  sites  and  trunks,  is  underway.  The
       completion of the DODIIS AFIS site has  been  delayed  due  to  a
       facility rehabilitation project.  Other DODIIS site installations
       are being  delayed  due  to  problems  with  ATTIS  and  BOCs  in
       providing  interswitch  trunks.  Current information indicates an
       IOC in the May/June 1985 time period.  (Mr. Charles  F.  Russell,
       703-285-5102, (V) 356-5102.)



                     HOST INTERFACE QUALIFICATION ACTIVITY

       The  Test  and  Evaluation  Branch,  B617,  recently  tested  the
       Advanced Computer Communications  (ACC)  IF-11/X.25  version  3.7
       interface  and it was granted a fully qualified status to operate
       on the DDN.  Several other interfaces are currently being  tested
       and  are close to passing the qualification test. (Mr. Chuck Ely,
       B617, 703-285-5337, (V) 356-5337)



          DRAFT DCA CIRCULAR FOR X.25/1822 HDH QUALIFICATION TESTING

       A  draft  DCAC  370-P195-XX  entitled   "Defense   Data   Network
       Qualification Testing-Link and Network Layers" is complete and in
       the  process  of  being  edited.    This  circular  provides  the
       administrative  actions  and  test procedures necessary to insure
       that candidate hosts for the  Defense  Data  Network  (DDN)  will
       properly interface with the network.  Both access protocols--X.25







                                       4
       DDN Newsletter Special Issue 39                       25 Apr 1985





       and 1822 HDH--required for qualification are covered.  (Mr. Chuck
       Ely, B617, 703-285-5337, (V) 356-5337.)



                        DDN HOST INTERFACE ACQUISITION

       To  increase  the  commercial  availability of DDN interfaces for
       major computer systems, the DDN PMO has now  awarded  to  various
       vendors  a  total  of  seven  contracts.    The  two  most recent
       contracts were awarded to Honeywell Information Systems  for  the
       DPS  8  GCOS  8 family, and to IBM Corporation for the IBM 370 VM
       family.  An eighth contract is currently in progress.

       Contracts awarded to-date are listed below:
                 Company                          Host Family

          Control Data Corporation          CDC Cyber 170 - NOS
          Gould Software Division           DEC VAX - VMS
          Honeywell Information Systems     HIS DPS 8 - GCOS 8
          Honeywell Information Systems     HIS Level 6 - GCOS 6 MOD 400
          Network Solutions                 IBM 370 - MVS
          IBM Corporation                   IBM 370 - VM
          Internet Systems                  Sperry 1100 - OS/1100


       These contracts require  that  the  interface  be  installed  and
       tested  in  a  government-designated  test  site.   The U.S. Army
       Information  Systems  Software  Support  Command,  Falls  Church,
       Virginia, has been designated as the test site for the IBM 370 VM
       interface.  Selection of other test sites is in progress.



                        PERSONAL COMPUTER (PC) SUPPORT

       The DDN PMO has launched several initiatives to improve  personal
       computer  access  to  the  MILNET,  recognizing  that  the use of
       personal computers is one of the  Military  Department's  fastest
       growing needs in computer processing.

       To  provide a more suitable PC interface for the short term, some







                                       5
       25 Apr 1985                       DDN Newsletter Special Issue 39





       minor enhancements are planned for the C/30 TAC.  While the  C/30
       TAC  is  superb  at  providing  an  interface  with  a human at a
       keyboard, it was never intended to handle the steady data  stream
       generated  by a personal computer uploading a file, or to provide
       many of the applications being requested by the growing  tide  of
       personal computer users.

       Enhancements  currently  being  worked on include changes in flow
       control handling and provision for direct communication  from  PC
       to PC.  For instance, the effective data throughput of a C/30 TAC
       for a  pc-to-host  connection  is  between  300  and  1200  baud,
       depending  on  the  make of the PC and the software in use on it.
       In particular, flow control handling problems are caused  when  a
       TAC  transmits an XOFF signal to the PC to stop the flow of data.
       Currently, this  occurs  when  the  input  buffer  is  within  12
       characters  from  overflow.   This is more than adequate when the
       TAC is interfacing with a human being, as it was designed to  do.
       However,  many PCs simply do not react to the XOFF quickly enough
       to avoid overflowing the 12 character spaces left  in  the  TAC's
       input  buffer.    A  corrective  action  under  consideration  to
       compensate for this  problem  includes  raising  the  TAC's  XOFF
       trigger  point from 12 characters to a greater value, thus giving
       the PC more time to react.

       For the long term, a different approach is  required.    Although
       some  limited gains such as described above are possible with the
       C/30,  any  other  substantial  changes   would   require   major
       modifications  to  TAC hardware or software or both.  This is not
       desirable for a variety of reasons.   A  number  of  options  are
       under study, and a decision is expected later this year regarding
       the optimum approach.   (Maj.  Glynn  Parker,  703-285-5133,  (V)
       356-5133.)



                           MILNET TAC ACCESS CONTROL

       The  MILNET  TAC  Access  Control  System  (TACACS), Phase 1, was
       extended into Europe in January 1985.  Initially, the system  was
       implemented   with   a  universal  password  for  familiarization
       purposes as was done with MILNET TACACS, in the CONUS and Pacific
       areas,  and  the  system  became  fully  operational using unique







                                       6
       DDN Newsletter Special Issue 39                       25 Apr 1985





       individual IDs and Access Codes on 6 February 1985.

       ARPANET introduced a  separate  login  system  in  January  1985.
       ARPANET TAC login uses conventional passwords which are validated
       by login hosts  whereas  MILNET  TACACS  validation  of  IDs  and
       passwords  is  handled  in  the  IMP  or node.  Phase 2 of MILNET
       TACACS involves a plan to use login hosts, pending  a  period  of
       observation  and careful evaluation of the ARPANET system.  (Maj.
       Glynn Parker, 703-285-5133, (V) 356-5133.)



                 DEADBOLT--AN ENCRYPTION/AUTHENTICATION DEVICE

       A prototype device, known as DEADBOLT, is being  constructed  for
       NSA  by  the MITRE Corporation.  DCA is participating with NSA in
       the development of this Low-cost Encryption/Authentication Device
       (LEAD)   for   terminal-to-host   communication  in  unclassified
       applications.  This prototype will be used in an operational test
       to be conducted in late spring. (Maj. Glynn Parker, 703-285-5133,
       (V) 356-5133.)



                   USER REQUIREMENTS DATABASE (URDB) STATUS

       As of 31 January 1985, the User  Requirements  Data  Base  has  a
       total of 4561 Hosts and 16641 Terminals registered.  Navy and Air
       Force have started validation efforts in order to clean up  their
       portion  of  the  database.    On-site  training was conducted at
       COMNAVTELCOM in Washington, and Gunther AFB, Alabama.

       Efforts have also begun  in  the  redesign  of  the  database  in
       preparation  for conversion to ADABAS.  This work is scheduled to
       begin  during  the  next  quarter.    (Ms.  Sandy   Vest,   B616,
       703-285-5456, (V) 356-5456.)



                  TELECOMMUNICATIONS SERVICE REQUESTS (TSRS)

       The  DDN  PMO  Telecommunications  Management  Section  has  been







                                       7
       25 Apr 1985                       DDN Newsletter Special Issue 39





       reorganized, according to Mr. John Claitor,  Chief  of  the  Data
       Base   and   Configuration  Management  Branch.    This  section,
       presently under  control  by  this  branch,  is  responsible  for
       processing all requirements attached to the Feeder TSR forms--the
       forms to request DDN service.  Headed by Mr. Ron Gutschmidt,  the
       section   encompasses   three  data  entry  personnel,  two  port
       allocators, four technical administrative personnel and one  work
       administrator.    An  additional  three  technical administrative
       personnel and one port allocator are being recruited in order  to
       satisfy   user  and  backbone  requirements  in  an  orderly  and
       effective manner.

       The requirements processed within  the  DDN  PMO  have  increased
       considerably over the past two years.  In FY 1983, a total of 521
       DDN TSRs were processed, and in  FY  1984,  1290  DDN  TSRs  were
       issued.    So  far  in FY 1985, a total of 800 DDN TSRs (Oct-Jan)
       were processed, with  an  estimation  of  3000  DDN  TSRs  to  be
       processed  during  the  FY  1985  year.   Presently, this section
       processes approximately 40 DDN  TSRs  to  the  field  each  week,
       including  user requirements, backbone trunks and dial-up service
       lines to the TAC.

       The  processing  of  DDN  TSRs  is  being  accomplished  using  a
       semi-automated  process  by  a direct connection to the DCA/DCAOC
       computer.  Feeder TSRs  are  received,  transformed  into  a  DDN
       formatted  TSR  and  turned  over to the technical administrative
       personnel.  Information is then added by the port allocators  and
       technical   administrative   personnel,   reviewed  by  the  work
       administrator,  and  finally  transmitted  by  the   data   entry
       personnel.

       However,  the  process  is still being hindered because some TCOs
       have not addressed the Feeder TSRs to the  correct  RI  (RUEJDDN)
       and PLA (DDN PMO TSR-CRP TRAFFIC WASHINGTON D.C.).



                           DDN COST ALLOCATION MODEL

       The September 1984 Defense Data Network Cost Allocation Model was
       distributed  on  10  January  1985.    Publication  of  the  Cost
       Allocation  Model  came  in response to requests from prospective







                                       8
       DDN Newsletter Special Issue 39                       25 Apr 1985





       DDN users that a method be provided by  which  various  proposals
       for  utilization  of the DDN may be compared and evaluated during
       the ADP acquisition process.  Limited distribution  was  made  to
       cognizant  DoD  agencies  and  MILDEP activities and each MILDEP,
       DCS, or O&M command  was  provided  with  150  copies  for  their
       distribution.

       Entry  of this publication into the Defense Technical Information
       Center (DTIC) is also planned.   In  the  interim,  requests  for
       copies  should  be addressed to the parent agency or MILDEP, DCS,
       or  O&M  commands.  (James  Powell,   B613,   703-285-5101,   (V)
       356-5101.)



                             DDN LOGISTIC SUPPORT

       The  1 December 1984 DDN Newsletter reported that the DDN PMO had
       tasked Dynamics Research Corporation to do a comparative logistic
       support  concept  analysis  for  DDN.    The  final report of the
       analysis has been delivered and  is  being  integrated  into  the
       Logistic Support Concept for DDN.

       A  Management  Team (ILSMT), hosted by the Deputy Program Manager
       for Logistics (DPML), was held at 7915  Westpark  Drive,  McLean,
       Virginia  on  12  and  13  March  1985.    (James A. Evans, B635,
       703-285-5443, (V) 356-5443.)



       NETWORK ACCESS COMPONENT (NAC) UNITS FOR THE DEFENSE DATA NETWORK

       A firm-fixed-price contract, DCA200-85-C-0007, was awarded on  12
       February  1985 to Aydin Monitor Systems, 502 Office Center Drive,
       Fort Washington, Pa 19034, in the amount  of  $3,890,732.    This
       contract is for the development of NAC units.  These units are to
       be configured as Mini-terminal  Access  Controllers  (MINI-TACs),
       Host   Front   End   Processors  (HFEPs)  or  Terminal  Emulation
       Processors  (TEPs).    The  contract   also   includes   optional
       production  in the amount of $14,109,268.  The schedule calls for
       the development  to  be  completed  by  September  of  1985  with
       production   units   to   be  available  7  months  later.    RFP







                                       9
       25 Apr 1985                       DDN Newsletter Special Issue 39





       DCA200-84-R-0027 was released on 27 June 1984 to 93  contractors,
       and  four  responses  were  received.   The contracting office is
       DECCO D560 and the contracting officer is  Major  George  Tucker,
       Code   D560,  phone  618-256-5196.    The  contracting  officers'
       technical   representative   is   Ronald   Hyrkas,   Code   B626,
       703-285-5105.  (James Powell, B613, 703-285-5101, (V) 356-5101.)



                             REQUEST FOR DOCUMENTS

       Private  companies  have  made numerous calls and requests to the
       DDN PMO for copies of  documents  while  preparing  responses  to
       requests  for  proposals  (RFPs).    To obtain copies of most DDN
       documents, the following procedures are suggested:

       If your  organization  is  a  member  of  the  Defense  Technical
       Information  Center,  (DTIC),  documents  may be obtained through
       them at the following address:

               Defense Technical Information Center (DTIC)
               Cameron Station
               Alexandria, Virginia  22304-6145
               703-274-7633

       Also, many documents may be obtained from  the  following  public
       information center:

               National Technical Information Service (NTIS)
               5285 Port Royal Road
               Springfield, Virginia  22161
               703-487-4650

       Military  Standards  may  be  ordered (use DD Form 1425) from the
       following:

               Naval Publications and Forms Center (NAV-PUBS)
               5801 Tabor Avenue
               Philadelphia, Pennsylvania  19120
               215-697-3321

       If you are not sure where to  obtain  needed  documents,  contact







                                      10
       DDN Newsletter Special Issue 39                       25 Apr 1985





       User  Assistance  at the DDN Network Information Center using the
       toll-free "hotline", 1-800-235-3155, or  by  electronic  mail  to
       NIC@SRI-NIC.ARPA.   (Charlotte   Hart,  B613,  703-285-5031,  (V)
       356-5031.)



                   DDN MANAGEMENT BULLETINS AND NEWSLETTERS

       The following lists summarize the  most  current  DDN  Management
       Bulletins  and  DDN  Newsletters. These are available online from
       the host, SRI-NIC, at the DDN Network Information  Center  (NIC).
       Users  may  obtain copies of these files via FTP from the SRI-NIC
       machine [10.0.0.51, 26.0.0.73] by logging in as "anonymous"  with
       password="guest" and using the pathnames:

               DDN-NEWS:DDN-MGT-BULLETIN-xx.TXT and
               DDN-NEWS:DDN-NEWS-xx.TXT

       where xx = the issue number.


                           DDN Management Bulletins

       DDN  Management  Bulletins, distributed by the NIC for DCA, are a
       means of communicating official  policy,  procedures,  and  other
       information  of concern to management personnel at DDN facilities
       and other management organizations.





















                                      11
       25 Apr 1985                       DDN Newsletter Special Issue 39





       Issue
       Number      Date         Topic(s)

         12      1 Sep 83    Public Host Available for Software
                             Verification
         17     21 Dec 83    Registration:  A Vital Requirement; TAC
                             Numbers Published;  Questions asked about
                             User Registration
         18     13 Jan 84    Interim Guidance for Host Password
                             Discipline
         20      6 Mar 84    Implementation of Mail Bridge Filters
         22     16 Mar 84    Domain Names Transition
         23     29 Aug 84    New Host to Primary and Secondary
                             Mailbridge Assignments
         24     17 Sep 84    Node Site Coordinator Duties; Host
                             Administrator Duties; Technical Liaison
                             Duties
         26     30 Jan 85    Management of DDN TACs

                                DDN Newsletters

       The DDN Newsletter provides information of  general  interest  to
       users.    Both  official and unofficial articles are published in
       the DDN Newsletter.  Articles in  the  official  section  contain
       policy  announcements  and  general  information disseminated for
       review, adherence,  and  possible  response.    Articles  in  the
       unofficial  section contain items of general information which do
       not necessarily represent official policy or practice.  As  space
       permits, this section may include items submitted by users.  Such
       items should be as brief as possible, and should be forwarded  to
       NEWS@SRI-NIC.ARPA  or  DCACODEB613@DDN1.ARPA  for  consideration.
       All articles for the unofficial  section  should  be  signed  and
       should provide the organizational affiliation of the contributor.
















                                      12
       DDN Newsletter Special Issue 39                       25 Apr 1985





       Issue
       Number      Date         Topic(s)

         23      7 Apr 83    ARPANET IMPs and TACs
         36     17 Oct 84    DDN TAC Mgt; ARPANET TAC Access; TAC
                             Standardization; DDN User Assistance; DDN
                             Directory
         37      1 Dec 84    Special Issue
         38      8 Mar 85    Network Protocols

       If  access  to  the  network  is via a TAC, users may read online
       issues with the TACNEWS service.  To access the TACNEWS  service,
       just after connecting to a TAC

          - Type "@n<Return>"

          - Log in to the TAC

          - Type "tacnews<Return>" at the @ sign

          - Type "help <Return>" for further instructions or help

       If  you experience problems invoking these procedures please call
       User Assistance at the NIC, 1-800-235-3155.  (Mr.  Jack  Snively,
       B646, 703-285-5227, (V) 356-5227.)
























                                      13